
A German OPV for MMEA?
SHAH ALAM: TWO German-designs are said to be in the running for the project to replace the two 30-year-old Langkawi-class OPVs operated by the Malaysian […]
SHAH ALAM: TWO German-designs are said to be in the running for the project to replace the two 30-year-old Langkawi-class OPVs operated by the Malaysian […]
LANGKAWI: Day 3 of LIMA 2015 kicked off with the contract signing ceremony, the true highlight of any airshow. As duly reported previously by Malaysian […]
SHAH ALAM: Industry sources has told Malaysian Defence that a 43 metre design from Fassmer has been selected for the MMEA’s New Generation Patrol Craft […]
Copyright © 2023 | WordPress Theme by MH Themes