Defence Contract

On The Way and On Target

SHAH ALAM: Back on August 4 2020, Malaysian Defence wrote that the Defence Ministry had issued a request for bids for the supply, delivery, and commissioning of “mini” Combat Management System (mini-CMS) for RMN’s fleet of fourteen fast attack craft of three different classes. The FACs are – six Jerong […]

Defence Contract

Out Of The Blue

SHAH ALAM: Out of the blue. KD Ganyang – pennant number 3504 – has been fitted with a electro-optical turret to replace its obsolete Thomson CSF fire control system. It is unclear when the ship was installed with the EO system though it is likely from June, 2019 onwards as […]

Malaysia -RMN

Back To The Future III

SHAH ALAM: Back to the future III. In the earlier post Back to the Future I reported that the newly refitted Laksamana class ships did not appear to be equipped with the Gem Electronicca Electro Optical Fire Control System (EOFCS). This was based on the pictures of the ships put […]